Arts Centre Melbourne
Australia
Melbourne
150+
Number of Machinery
2
Number of Venues
2021
Year of Completion
7
Duration of Project in Months
Facts and Figures
Over 100 scenery in the upper machinery, 107 fly bar hoists, 22 chain hoists and 12 mobile point hoists were installed in just seven months. New control and lighting systems and C⋅A⋅T V5 gallery consoles (C⋅A⋅T 550) were also introduced.
Type of venue
Waagner-Biro Stage Systems played a central role in the refurbishment of the State Theatre at Arts Centre Melbourne, a renowned performing arts center.
This refurbishment included an extensive modernization of the stage technology, including the installation of over 100 scenery hoists in the upper machinery and the implementation of new control and lighting systems.
The modernization of the State Theater also included the installation of the newly developed C⋅A⋅T V5 gallery consoles (C⋅A⋅T 550), which enable precise and efficient control of the stage technology. Waagner-Biro Stage Systems acted as the main contractor for all renovation work, including the stage machinery, lighting and project-related construction work.
In total, an impressive 107 fly bar hoists, 22 chain hoists and 12 mobile point hoists and many more were installed for the renovation, which was completed within a tight seven-month deadline.
New control system C⋅A⋅T 550 at Arts Centre Melbourne by Waagner-Biro Stage Systems
Waagner Biro Stage Systems